Pre-Tour Briefing — Surface BOP Well Control (IWCF / IADC Standard)
You are the Driller on an onshore rig drilling the 8-1/2" production hole section at 8,200 ft TVD with 10.0 ppg water-based mud. Monitor the driller's console instrumentation continuously. Upon detecting primary or secondary kick indicators, execute the rig's shut-in procedure in accordance with API RP 53 and IWCF / IADC WellSharp standards, record stabilized shut-in pressures (SIDPP & SICP), and calculate the required Kill Mud Weight (KMW).
Simulation time is accelerated 4x. Kick onset occurs randomly after drilling begins. Compatible with SCORM 1.2 / 2004 and LMS postMessage API.
Wellhead & BOP Stack Schematic
Yellow shading in the annulus represents formation gas influx; the amber marker on the drillstring indicates the tool joint relative to the pipe rams.
Shut-In Pressure Strip Chart (SIDPP / SICP)
Observe SIDPP (amber) and SICP (green) curves stabilizing onto a plateau before recording shut-in pressures.